Do you do new bathrooms as well as bathroom renovations?

Serenity Bathrooms provides a full building service, including bathroom extensions, bathroom renovations and new bathrooms.

How long does a standard bathroom renovation take?

A standard bathroom renovation generally takes    2 – 3 weeks from start to finish.  This can vary depending on the size of the bathroom.


What do I need to do to prepare for my bathroom renovation?

We suggest that you remove all your personal items from the bathroom and we will do the rest. We cover the outside floor areas that we will be using and we will tidy up after each days work.

What about the tradespeople?

We use fully qualified, licensed and insured tradespeople. Our tradespeople have worked for Serenity Bathrooms for many years; they are all honest, reliable and polite.

How does the process work?

First we’ll come out and inspect the site and consult with you to find out your requirements, and provide you with a quote and schedule for your job. Once the contract has been signed, we then work together to select the accessories, tiles and fixtures. The process happens in consecutive stages. The first stage is the demolition and strip out, followed by electrical and plumbing, waterproofing and then tiling. Next the bathroom comes back together as the fixtures and bathroom accessories are installed and fitted. Finally, the job ends with a final check and clean and your new bathroom is ready for use.

Can we still use the bathroom white it is being renovated?

You will not be able to use the bathroom.
It is best to wait until all fixtures and shower screen are installed.

Can I change the layout of my bathroom?

You will not be able to use the bathroom.
It is best to wait until all fixtures and shower screen are installed.

Will we have water and electricity during the renovation?

Yes, the water and electricity will only be switched off for the minimum amount of time during the renovation process, usually a maximum of two hours at the most. We will give you plenty of notice when this will occur and we’ll do our best to ensure you are not inconvenienced.

Will you remove all rubbish?

We take care of rubbish both during the job and after completion. We provide a skip for rubbish removal.

What are your payment terms?

We require a 10% deposit before we start the job, a progress payment when the walls are sheeted and a progress payment when the fittings are installed. The balance when the shower screen is installed.